Environment (Construction and Demolition) Waste Management Rules, 2025

Central · Rule · Version 1

Source documentOfficial source available

Applicability

Construction, demolition, remodelling, renovation and repair of structures; Rule 2 contains exclusions for atomic-energy waste, defence/strategic projects, disaster/war waste and other sector-specific waste rules.

Issuing authority

Ministry of Environment, Forest and Climate Change, Government of India

Document reference

G.S.R. 219(E), 2 April 2025

Scope and applicability

Construction, demolition, remodelling, renovation and repair of structures; Rule 2 contains exclusions for atomic-energy waste, defence/strategic projects, disaster/war waste and other sector-specific waste rules.

Version and research notes

Identity, Rule 1 commencement and Rule 2 scope checked on PDF p. 19. EPR quantities, registration conditions, schedules and filing details remain under field-level review.

Official PDF

Source document

Official sources & provenance

Environment (Construction and Demolition) Waste Management Rules, 2025

Ministry of Environment, Forest and Climate Change, Government of India

Published
2 Apr 2025
Effective from
1 Apr 2026
Verification
reviewed
Captured
01/10/2026
PDF SHA-256
201e29b8d1c3aba64c41c95fcacc3aa82c7bc201135d3242d6471c7a73a5a184
View official source ↗View captured PDF ↗

Construction, demolition, remodelling, renovation and repair of structures; Rule 2 contains exclusions for atomic-energy waste, defence/strategic projects, disaster/war waste and other sector-specific waste rules.

Identity, Rule 1 commencement and Rule 2 scope checked on PDF p. 19. EPR quantities, registration conditions, schedules and filing details remain under field-level review.

Back to library records