CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text
Central · Regulation · Version 2
Source documentOfficial source available
Applicability
Electrical installations, electrical plants and lines, and persons involved in electricity generation, transmission, distribution, trading, supply or use; see Regulation 1(3).
Electrical installations, electrical plants and lines, and persons involved in electricity generation, transmission, distribution, trading, supply or use; see Regulation 1(3).
Original 2023 Gazette text, English pages numbered 100–183. CEA lists a 2026 amendment which is captured separately for visual review; original text is not represented as consolidated current regulations.
Electrical installations, electrical plants and lines, and persons involved in electricity generation, transmission, distribution, trading, supply or use; see Regulation 1(3).
Original 2023 Gazette text, English pages numbered 100–183. CEA lists a 2026 amendment which is captured separately for visual review; original text is not represented as consolidated current regulations.
Each entry retains its original PDF and reviewed applicability. Publication of an update does not establish that the entire earlier instrument is superseded. Read the cited provisions and effective dates.
Electrical installations, electrical plants and lines, and persons involved in electricity generation, transmission, distribution, trading, supply or use; see Regulation 1(3).
Electrical installations, electrical plants and lines, and persons involved in electricity generation, transmission, distribution, trading, supply or use; see Regulation 1(3).