Industrial boiler PM standards: 2023 final rule and corrigendum
Central · Rule · Version 1
Source documentOfficial source available
Applicability
Schedule I entry 70 final boiler PM standards, read with the captured June 2023 corrigendum. Fuel, equipment and coal/lignite power-plant exclusions are retained.
Issuing authority
Ministry of Environment, Forest and Climate Change, Government of India
Schedule I entry 70 final boiler PM standards, read with the captured June 2023 corrigendum. Fuel, equipment and coal/lignite power-plant exclusions are retained.
CPCB assembles the corrigendum on PDF p. 1 before the original Gazette pp. 2–4. Published date refers to the principal rule; corrigendum Gazette is 14 June 2023. No draft CEMS clause is carried forward. Selected source text, not all emission law or establishment consent conditions.
Schedule I entry 70 final boiler PM standards, read with the captured June 2023 corrigendum. Fuel, equipment and coal/lignite power-plant exclusions are retained.
CPCB assembles the corrigendum on PDF p. 1 before the original Gazette pp. 2–4. Published date refers to the principal rule; corrigendum Gazette is 14 June 2023. No draft CEMS clause is carried forward. Selected source text, not all emission law or establishment consent conditions.