Rajasthan factory plan permission and stability-certificate prerequisites

Rajasthan · Requirement · Version 1

Checked extractOfficial source available

Applicability

Rules 8 and 9: site use, building construction/extension/use and manufacturing in covered factory buildings. The notified third-party class and qualifications must actually be established; an up-to-50 non-hazardous factory Form-7 filing is not silently treated as a blanket exemption from all plan/stability duties. Final Rajasthan State rules published and commencing 30 June 2026. Appropriate-government, covered-factory and establishment-specific conditions must match; this is not a nationwide consolidated licence guide. Only cited clauses are checked.

Plan-permission branches

Plan-permission branches
ClauseCondition / applicantPrescribed action
8(1)Factory location site, or factory building construction, extension or taking into useObtain prior written permission from the Chief Inspector-cum-Facilitator.
8(1) first provisoFactory class specified by State Government; third party with notified qualification/experience, manner and recognitionOccupier may submit third-party-certified plans; Chief Inspector-cum-Facilitator accepts such plans.
8(1) second provisoThird-party-certified plans needing Code/rules/regulation compliance changesChief Inspector-cum-Facilitator may require amendments with reasons recorded in writing.
8(2)-(3)Permission applicationSubmit Form-6 on the Official Portal, or prescribed Single Window Act manner, with portal-specified plans/documents/specifications.
8(4)Factory employing up to 50 workers and involving a non-hazardous processAlso submit Form-7 along with Form-6 on the Official Portal.
8(5)Authority satisfied plans meet Code/rules/regulationsApprove electronically subject to specified conditions, or call for further necessary particulars.
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 7; rule 8(1) and first proviso; p. 8; rule 8(1) second proviso, (2)-(5)

Stability-certificate prerequisite

Do not carry on a manufacturing process in a constructed, reconstructed, extended or newly-used factory building until the occupier/manager has sent a competent-person stability certificate in Form-8 for each building or block to the Chief Inspector-cum-Facilitator or the authorized officer, and it has been accepted.

Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 8; rule 9: certificate, building scope, authority and acceptance

Source document

Official sources & provenance

Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23

Government of Rajasthan, Labour and Factories & Boilers Department

Published
30 Jun 2026
Effective from
30 Jun 2026
Verification
reviewed
Captured
05/10/2026
PDF SHA-256
5cb846f24b49ccc48f0c2a9ea8b3c3b4348d74f6d62c72514a2a34be4b6ac54a
View official source ↗View captured PDF ↗

Final 30 June 2026 Rajasthan State rules. Reviewed provisions include rule 110(21)-(29), (33)-(35), (51)-(52), and Schedule X Chemical Works Part II paragraphs 15, 17 and 18, with its Part I application, Appendix A and Part VIII exemption. Factory and chemical-process scope; no general construction duty or whole-rulebook consolidation is asserted. The additional bounded review covers Rule 2(1)(q)–(r), Rule 8 plan-permission and small non-hazardous-factory conditions, Rule 9 stability certificates, Rule 14 manager change, Rule 106 hazardous-process Form 6 reporting, Rule 123 separately notified competent-person recognition criteria, and the complete blank Forms 6, 7, 8 and 11 inventories. No actual approval, appointment, test result or current portal checklist is represented. Also reviewed complete original blank Forms 1–5 and their distinct registration, certificate, authority-register, operation-notice and factory-licence branches under Rules 5(1)(a)/(d), 5(6)/(8)/(9), 6(1), 12, 13(3), 16(2), 17(2), 18 and 129. Printed establishment alternatives, internal certificate cross-reference discrepancy, original register column numbering and the saving for pending licence cases are retained; no current portal checklist or whole-rulebook consolidation is asserted.

Native text and rendered source pages reviewed. State-rule applicability must match the factory and appropriate-government jurisdiction. Numeric atmospheric limits and a general height threshold are not inferred. Only the listed provisions are checked. Additional original form pages 175–177 and 181 and their rule context on pages 2, 7–8, 10, 142 and 164 were personally reviewed. Form 6 has distinct Rule 8 and Rule 106 routes; Form 7 requires both up-to-50 workers and a non-hazardous process; Form 8 requires a separate accepted certificate for each applicable building/block; Form 11 has no numerical deadline in Rule 14. Separate State-notified competent-person criteria and portal document specifications remain outside this review. Original Gazette PDF pages 3–5, 9–11 and 165–175 independently inspected for these full blank inventories. The form’s printed mine/dock alternatives are content, not a finding of State jurisdiction over a particular mine or major port. Existing Source identity/legal dates, PDF bytes, prior reviewed scope qualifiers and complete history must be preserved.