Rajasthan electricity factory Table B annual licence fees

Rajasthan · Requirement · Version 1

Checked extractOfficial source available

Applicability

Rule 6(2), Fees Table B(a)-(c) and Explanation 1. Generating/transforming (including converting) stations and transmitting stations retain distinct fee classes. The original table heads both monetary columns under total installed generating capacity in kW; this is preserved without renaming it a transformer-rated-capacity standard. The internally exclusive supply case in printed Explanation 2 remains separately held for table-selection reconciliation. Final Rajasthan State rules published and commencing 30 June 2026. Appropriate-government, covered-factory and establishment-specific conditions must match; this is not a nationwide consolidated licence guide. Only cited clauses are checked.

Table B(a): annual fees (INR)

Table B(a): annual fees (INR)
Printed capacity relationPrinted capacity (kW)Generating stations (INR/year)Transforming / converting (INR/year)
Not exceeding50600300
Not exceeding1001100600
Not exceeding1501300900
Not exceeding30018001100
Not exceeding50023001300
Not exceeding75032001800
Not exceeding100036002300
Not exceeding250069005100
Not exceeding5000103506900
Not exceeding10000120008550
Not exceeding250001380010350
Not exceeding500002070013800
Not exceeding750002760017250
Not exceeding1000003450022200
Not exceeding1500005560036800
Not exceeding2000006440046000
Not exceeding10000007360059800
Over1000000138000110400
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 6; Fees Table B(a): first ten capacity rows; p. 7; Fees Table B(a): remaining eight rows

Transmitting-station annual fee (INR)

6900

Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 7; Fees Table B(b): all transmitting stations

Additional registration percentage

50

Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 7; Fees Table B(c): registration addition of 50%

Registration addition condition

At registration of a factory, 50% of the fee payable for a year under Fees Table B is payable in addition to the yearly fee.

Separate-station fee aggregation branch

Where a generating factory includes a transmitting or converting station or plant receiving, transforming, converting or transmitting electric power from outside the generating station and not meant for transforming, converting or transmitting its own generated power, sum the separately calculated generating, transforming (including converting) and transmitting station fees as if they were separate factories.

Source document

Official sources & provenance

Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23

Government of Rajasthan, Labour and Factories & Boilers Department

Published
30 Jun 2026
Effective from
30 Jun 2026
Verification
reviewed
Captured
05/10/2026
PDF SHA-256
5cb846f24b49ccc48f0c2a9ea8b3c3b4348d74f6d62c72514a2a34be4b6ac54a
View official source ↗View captured PDF ↗

Final 30 June 2026 Rajasthan State rules. Reviewed provisions include rule 110(21)-(29), (33)-(35), (51)-(52), and Schedule X Chemical Works Part II paragraphs 15, 17 and 18, with its Part I application, Appendix A and Part VIII exemption. Factory and chemical-process scope; no general construction duty or whole-rulebook consolidation is asserted. The additional bounded review covers Rule 2(1)(q)–(r), Rule 8 plan-permission and small non-hazardous-factory conditions, Rule 9 stability certificates, Rule 14 manager change, Rule 106 hazardous-process Form 6 reporting, Rule 123 separately notified competent-person recognition criteria, and the complete blank Forms 6, 7, 8 and 11 inventories. No actual approval, appointment, test result or current portal checklist is represented. Also reviewed complete original blank Forms 1–5 and their distinct registration, certificate, authority-register, operation-notice and factory-licence branches under Rules 5(1)(a)/(d), 5(6)/(8)/(9), 6(1), 12, 13(3), 16(2), 17(2), 18 and 129. Printed establishment alternatives, internal certificate cross-reference discrepancy, original register column numbering and the saving for pending licence cases are retained; no current portal checklist or whole-rulebook consolidation is asserted.

Native text and rendered source pages reviewed. State-rule applicability must match the factory and appropriate-government jurisdiction. Numeric atmospheric limits and a general height threshold are not inferred. Only the listed provisions are checked. Additional original form pages 175–177 and 181 and their rule context on pages 2, 7–8, 10, 142 and 164 were personally reviewed. Form 6 has distinct Rule 8 and Rule 106 routes; Form 7 requires both up-to-50 workers and a non-hazardous process; Form 8 requires a separate accepted certificate for each applicable building/block; Form 11 has no numerical deadline in Rule 14. Separate State-notified competent-person criteria and portal document specifications remain outside this review. Original Gazette PDF pages 3–5, 9–11 and 165–175 independently inspected for these full blank inventories. The form’s printed mine/dock alternatives are content, not a finding of State jurisdiction over a particular mine or major port. Existing Source identity/legal dates, PDF bytes, prior reviewed scope qualifiers and complete history must be preserved.