Applicability

Original final Rajasthan State Rules within their appropriate-government and establishment scope, not an all-India Central form. Rule 5(1)(d) is the printed issue route. Printed factory, mine, dock and construction tables are alternative certificate branches; no actual certificate or jurisdiction determination is supplied.

Form 2: every opening certificate blank

Form 2: every opening certificate blank
Printed positionPrescribed blank, column or statement
Opening: registration numberRegistration No.
Opening: dateDate
Certificate grant paragraphName of the establishment
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 168; Form 2 opening and first establishment particulars

Form 2 item 1: all printed nature-of-work choices

Form 2 item 1: all printed nature-of-work choices
Printed positionPrescribed blank, column or statement
(a)Factory
(b)Mining
(c)Dock work
(d)Contract Work
(e)Building and Other Construction Works
(f)Any other work (not covered above)
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 168; Form 2 opening and first establishment particulars

Form 2 item 2: all establishment counts and contractor details

Form 2 item 2: all establishment counts and contractor details
Printed positionPrescribed blank, column or statement
2(a)Total Number of employees engaged directly in the establishment
2(b)Total Number of the employees engaged through contractor
2(c)Total Number of Contractors and their details
2(d)Number of inter-state migrant workers engaged
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 168; Form 2 opening and first establishment particulars; p. 169; Form 2 further particulars, sector tables, execution and condition header

Form 2 3(a): complete printed factory alternative columns

Form 2 3(a): complete printed factory alternative columns
Printed positionPrescribed blank, column or statement
3(a), column 1Details of the manufacturing process
3(a), column 2Full postal address and situation of the factory along with plan approval details
3(a), column 3Name and address of the occupier and manager
3(a), column 4Maximum number of workers to be employed on any day
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 169; Form 2 further particulars, sector tables, execution and condition header

Form 2 3(b): complete printed mine alternative columns

Form 2 3(b): complete printed mine alternative columns
Printed positionPrescribed blank, column or statement
3(b), column 1Name of Mineral(s)
3(b), column 2Lease extent of the mine (in Acres)
3(b), column 3Name and address of the owner
3(b), column 4Average Monthly output, targeted (Tonne)
3(b), column 5Maximum number of persons to be employed on any day
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 169; Form 2 further particulars, sector tables, execution and condition header

Form 2 3(c): complete printed dock alternative columns

Form 2 3(c): complete printed dock alternative columns
Printed positionPrescribed blank, column or statement
3(c), column 1Name of Dock Work / Major Port
3(c), column 2Types of Dock Works
3(c), column 3Name of the Cargo handled and stored along with quantity
3(c), column 4Name of the chemicals handled and stored along with quantity
3(c), column 5Name of the hazardous chemicals handled and stored along with quantity
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 169; Form 2 further particulars, sector tables, execution and condition header

Form 2 3(d): complete printed building and other construction alternative columns

Form 2 3(d): complete printed building and other construction alternative columns
Printed positionPrescribed blank, column or statement
3(d), column 1Type of Construction work
3(d), column 2Probable period of commencement of work
3(d), column 3Expected period for completion of work
3(d), column 4Details of approval of the local authority
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 169; Form 2 further particulars, sector tables, execution and condition header

Form 2: fee, remarks and every authority execution blank

Form 2: fee, remarks and every authority execution blank
Printed positionPrescribed blank, column or statement
4Amount of registration fee paid
5Remarks of registering officers
Authority execution: signatureSignature E-Sign/DSC of Registering Officer along with designation
Authority execution: placePlace
Authority execution: dateDate
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 169; Form 2 further particulars, sector tables, execution and condition header

Form 2: all printed conditions of registration

Form 2: all printed conditions of registration
Printed positionPrescribed blank, column or statement
1(a)The certificate of registration shall be non-transferable.
1(b)The number of workers employed in an establishment directly and contract employees shall not, on any day, exceed the maximum number specified in the certificate of registration.
1(c)Save as provided in these rules, the fees paid for the grant of registration certificate shall be nonrefundable.
2The employer shall intimate the change, if any, in the number of workers or the conditions of work to the registering officer within 30 days.
3The employer shall, within thirty days of the commencement and completion of any work, intimate to the Inspector-cum-Facilitator , having jurisdiction in the area where the proposed establishment or as the case may be work is to be executed, intimating the actual date of the commencement or, as the case may be, completion of establishment such work in Form -4 annexed to these rules electronically.
4A copy of the certificate of registration shall be displayed at the conspicuous places at the premises where the work is being carried on.
Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 170; Form 2 all conditions of registration; p. 169; Form 2 further particulars, sector tables, execution and condition header

Form 2: authority issuance and printed cross-reference discrepancy

The Form 2 header cites Rule 5(1)(d), which provides electronic issue of the certificate for a complete registration application. The certificate paragraph cites section 3(2) of the Code. The introductory Conditions of Registration paragraph on page 169 nevertheless prints “issued under rule 4”; that literal cross-reference is retained as an internal discrepancy, not silently changed or treated as a separate registration route. Printed mine and dock alternatives are reproduced as certificate content only; they do not establish State-government jurisdiction over a particular mine or major port.

Source reference: Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23 · p. 4; Rule 5(1)(d) certificate issuance; p. 168; Form 2 opening and first establishment particulars; p. 169; Form 2 further particulars, sector tables, execution and condition header

Source document

Official sources & provenance

Rajasthan Occupational Safety, Health and Working Conditions Rules, 2026 - final S.O.23

Government of Rajasthan, Labour and Factories & Boilers Department

Published
30 Jun 2026
Effective from
30 Jun 2026
Verification
reviewed
Captured
05/10/2026
PDF SHA-256
5cb846f24b49ccc48f0c2a9ea8b3c3b4348d74f6d62c72514a2a34be4b6ac54a
View official source ↗View captured PDF ↗

Final 30 June 2026 Rajasthan State rules. Reviewed provisions include rule 110(21)-(29), (33)-(35), (51)-(52), and Schedule X Chemical Works Part II paragraphs 15, 17 and 18, with its Part I application, Appendix A and Part VIII exemption. Factory and chemical-process scope; no general construction duty or whole-rulebook consolidation is asserted. The additional bounded review covers Rule 2(1)(q)–(r), Rule 8 plan-permission and small non-hazardous-factory conditions, Rule 9 stability certificates, Rule 14 manager change, Rule 106 hazardous-process Form 6 reporting, Rule 123 separately notified competent-person recognition criteria, and the complete blank Forms 6, 7, 8 and 11 inventories. No actual approval, appointment, test result or current portal checklist is represented. Also reviewed complete original blank Forms 1–5 and their distinct registration, certificate, authority-register, operation-notice and factory-licence branches under Rules 5(1)(a)/(d), 5(6)/(8)/(9), 6(1), 12, 13(3), 16(2), 17(2), 18 and 129. Printed establishment alternatives, internal certificate cross-reference discrepancy, original register column numbering and the saving for pending licence cases are retained; no current portal checklist or whole-rulebook consolidation is asserted.

Native text and rendered source pages reviewed. State-rule applicability must match the factory and appropriate-government jurisdiction. Numeric atmospheric limits and a general height threshold are not inferred. Only the listed provisions are checked. Additional original form pages 175–177 and 181 and their rule context on pages 2, 7–8, 10, 142 and 164 were personally reviewed. Form 6 has distinct Rule 8 and Rule 106 routes; Form 7 requires both up-to-50 workers and a non-hazardous process; Form 8 requires a separate accepted certificate for each applicable building/block; Form 11 has no numerical deadline in Rule 14. Separate State-notified competent-person criteria and portal document specifications remain outside this review. Original Gazette PDF pages 3–5, 9–11 and 165–175 independently inspected for these full blank inventories. The form’s printed mine/dock alternatives are content, not a finding of State jurisdiction over a particular mine or major port. Existing Source identity/legal dates, PDF bytes, prior reviewed scope qualifiers and complete history must be preserved.