Electrical Safety

CEA consumer installation tests and above-650 V commissioning records

Checked extractOfficial source available

Applicability

Regulation 33 governs consumer-installation tests on new/additional supply or the specified reconnection. Regulation 48 is in Chapter VI for apparatus and installations exceeding 650 V. Its manufacturer-certificate duty is conditional on being required, and its periodic test interval follows relevant standards.

Consumer-installation testing routes

Consumer-installation testing routes
ProvisionApplicable casePrescribed requirement
33(1)New or additional supply; before commencement or recommencement after disconnection for a period of six monthsSupplier either tests the installation itself or accepts consumer test results duly signed by the licensed electrical contractor.
33(1), provisoVoltage equal to or below notified voltage; owner requestA Chartered Electrical Safety Engineer may also test the installation.

Testing standards and equipment calibration

Testing and verification shall follow relevant standards. Testing equipment shall be periodically calibrated by a Government-authorised or NABL-accredited laboratory at the periodicity specified by that laboratory.

Supplier consumer-test records and dangerous-installation notice

The supplier shall maintain test results at each consumer supply point in Schedule III forms. If inspection/testing satisfies it that the installation is likely dangerous, it shall give the applicant written notice of necessary safety modifications and may refuse connection or reconnection until they are completed.

Commissioning and recommissioning site tests

Commissioning and recommissioning site tests
ProvisionApplicable casePrescribed requirement
48(2)New apparatus, cable or supply line exceeding 650 VDo not commission until site tests are performed as per relevant standards.
48(3)Apparatus, cable or supply line exceeding 650 V disconnected for six months or more for alterations or repairDo not reconnect until site tests are performed as per relevant standards.

Manufacturer certificates and Inspector-directed tests

Before Regulation 45 approval, produce manufacturer type, acceptance and routine-test certificates to relevant standards if required. The Electrical Inspector may require tests before or after charging, notwithstanding this regulation.

Maintenance and comparable records

Keep apparatus, cables and supply lines healthy and test periodically to relevant standards. Retain records of all tests, trippings, maintenance works and repairs so they can be compared with past records. Owners of installations exceeding 650 V must operate and maintain them free from danger and as recommended by the manufacturer or relevant standards.

Specified 220 kV-and-above failure reports

Specified 220 kV-and-above failure reports
Failure / stepResponsible partyRequired report and period
Failure of a 220 kV-and-above transformer, reactor or transmission-line towerOwner of electrical installationReport occurrence to the Authority within forty-eight hours.
The same specified failureOwner of electrical installationSend reasons and recurrence-prevention measures to the Authority within one month of occurrence in Schedule VII forms.

Mines and oil-fields failure-report proviso

The Regulation 48(8) proviso states: “in case of mines and oil-fields, the failure of 10 MVA or above transformers shall be reported to Electrical Inspector of mines.”

Related sources

Acts, rules and notifications

Official sources & provenance

CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text

Central Electricity Authority, Ministry of Power

Published
12 Jun 2023
Effective from
12 Jun 2023
Verification
reviewed
Captured
01/10/2026
PDF SHA-256
2b1ee07ef090f2a0b2c2673e117fdff1e9821c54d5f7812fd77958e1dcf70add
View official source ↗View captured PDF ↗

Electrical installations, electrical plants and lines, and persons involved in electricity generation, transmission, distribution, trading, supply or use; see Regulation 1(3).

Original 2023 Gazette text, English pages numbered 100–183. CEA lists a 2026 amendment which is captured separately for visual review; original text is not represented as consolidated current regulations.

CEA electrical safety amendment, 2026 — battery storage rules commencing April 2027

Central Electricity Authority, Ministry of Power

Published
30 Mar 2026
Effective from
1 Apr 2027
Verification
reviewed
Captured
01/10/2026
PDF SHA-256
8314ccff23f429fd652e7ac92e9a46d7575cdcbc278d2ac6f0abd561778efeb1
View official source ↗View captured PDF ↗

Upcoming battery energy storage system provisions in Chapter XA. Regulations 122A–122M cover BESS above 650 V; Regulation 122N addresses BESS at or below 650 V. Commencement is 1 April 2027, not 2026.

Original scanned Gazette manually rendered and read on PDF pp. 1, 4–7. Publication header, English commencement clause and limited BESS scope reviewed. This amendment is upcoming as of 5 October 2026; current 2023 regulations remain separate. No OCR or complete technical compliance certification is claimed.