Water, Effluent & Sewage Compliance

CETP members: pretreatment, flow data and discharge controls

Checked extractOfficial source available

Applicability

CETP treated outlet under final Schedule I entry 55, effective 1 September 2025. Three discharge routes remain distinct. NS is absence of a specified value in this entry, not zero or unrestricted discharge. Stricter consent/Board standards and ZLD conditions can apply. Member PETP outlets and CETP inlet use separately specified Board/consent limits.

Discharge sources

Each member industry must use a single discharge point to the conveyance system leading to CETP.

Source reference: CETPs: final discharge standards and operating duties · p. 12; Note 4 member role 3

Permitted limits

Meet the PETP outlet norms in the member’s State Board/PCC consent. Pretreated effluent quantity and quality discharged to CETP must not exceed the Board/PCC specified limits.

Source reference: CETPs: final discharge standards and operating duties · p. 12; Note 4 member roles 1,2(b)

Monitoring frequency

Monitor specified effluent quality parameters and flow rate, and submit the data to the CETP operator on a real-time online basis.

Source reference: CETPs: final discharge standards and operating duties · p. 12; Note 4 member role 2(a)

Operation and maintenance payments

Pay the member’s share towards CETP operation and maintenance costs on time through online mode.

Source reference: CETPs: final discharge standards and operating duties · p. 12; Note 4 member role 4

Treatment requirements

Maintain leaking valves, cracked/fissured pipes and faulty equipment to avoid resource wastage and pollution; segregate, store and dispose of hazardous wastes from unit operations and primary treatment according to authorisation conditions.

Source reference: CETPs: final discharge standards and operating duties · p. 12; Note 4 member roles 5–6; p. 12; Member 6

Operator compliance controls

CETP agencies may access member premises without prior notice to take wastewater samples and cross-check accessible OCEMS data. They must regulate member flows and take appropriate action for norm breaches or overdue agreed O&M contributions, including refusal of effluent or membership cancellation.

Source reference: CETPs: final discharge standards and operating duties · p. 11; Note 4 operator roles 6–7; p. 11; Operator 7

Related sources

Acts, rules and notifications

Official sources & provenance

CETPs: final discharge standards and operating duties

Ministry of Environment, Forest and Climate Change, Government of India

Published
10 Sept 2024
Effective from
1 Sept 2025
Verification
reviewed
Captured
05/10/2026
PDF SHA-256
20d4d6851434bde01a5f070077544a0fa6ce4e44ea858fd863b254888ddd3274
View official source ↗View captured PDF ↗

Final substitution of Environment (Protection) Rules Schedule I entry 55 for CETPs. Outlet routes and conditional relaxations are separate from Board-specific CETP inlet and individual PETP consent limits.

English text checked on PDF pp. 7–12. No universal standalone-industry or sewage-treatment-plant limits are inferred. Subsequent facility consent conditions, stricter Board standards and complete current-law consolidation remain separate. Environmental-clearance requirements are outside this extract.