Industrial boilers: PM limits by fuel and capacity

Central · Requirement · Version 1

Checked extractOfficial source available

Applicability

Final Schedule I entry 70: listed industrial boilers, bagasse/agro-fuel power-plant boilers, TFH and HAG on equivalent fuel-consumption basis. Coal/lignite power-plant boilers use the separately notified thermal-power-plant standards; establishment consent limits must be checked separately.

Emission sources

Industrial boilers burning coal/lignite, pet coke, bagasse/agro-fuels or FO/LDO/LSHS; bagasse/agro-fuel power-plant boilers; thermic-fluid heaters and hot-air generators on equivalent fuel-consumption basis. Coal/lignite power-plant boilers are excluded from this table.

Source reference: Industrial boiler PM standards: 2023 final rule and corrigendum · p. 4; Entry 70 note (iii)

Permitted limits

Permitted limits
EquipmentFuel classSteam-generation capacityCapacity unitPollutantMaximum concentrationConcentration unit
Industrial boilerAgro-based fuels / bagasseLess than 2ton/hourParticulate matter500mg/Nm³
Industrial boilerOther listed fuelsLess than 2ton/hourParticulate matter500mg/Nm³
Industrial boilerAgro-based fuels / bagasse2 to less than 10ton/hourParticulate matter250mg/Nm³
Industrial boilerOther listed fuels2 to less than 10ton/hourParticulate matter150mg/Nm³
Industrial boilerAgro-based fuels / bagasse10 and aboveton/hourParticulate matter250mg/Nm³
Industrial boilerOther listed fuels10 and aboveton/hourParticulate matter100mg/Nm³
Source reference: Industrial boiler PM standards: 2023 final rule and corrigendum
PDF p. 4 · Full reference

p. 4; Entry 70 PM table

Monitoring method

Compare concentrations on a dry basis after normalising measured PM, SO₂ and NOx to 6% reference O₂ for solid fuels or 3% reference O₂ for liquid fuels. Normalised value = measured value × (21 − reference O₂%)/(21 − measured O₂%). The entry supplies PM limits; it does not itself supply numerical SO₂ or NOx limits.

Source reference: Industrial boiler PM standards: 2023 final rule and corrigendum · p. 4; Entry 70 note (ii)

Commencement and correction

Principal rule was published 17 May 2023 and commences after two years from publication. G.S.R. 435(E), Gazette 14 June 2023, corrects the omitted serial number from 37 to 97; entry 59 is also omitted.

Source reference: Industrial boiler PM standards: 2023 final rule and corrigendum · p. 4; Rule 1(2), Rule 2(b)-(c); p. 2; Principal Gazette header; p. 1; G.S.R. 435(E) corrigendum

Source document

Official sources & provenance

Industrial boiler PM standards: 2023 final rule and corrigendum

Ministry of Environment, Forest and Climate Change, Government of India

Published
17 May 2023
Effective from
17 May 2025
Verification
reviewed
Captured
05/10/2026
PDF SHA-256
07c3956385a496c81f817b333f1d8f696d548834c1d2067b837d920e298bed78
View official source ↗View captured PDF ↗

Schedule I entry 70 final boiler PM standards, read with the captured June 2023 corrigendum. Fuel, equipment and coal/lignite power-plant exclusions are retained.

CPCB assembles the corrigendum on PDF p. 1 before the original Gazette pp. 2–4. Published date refers to the principal rule; corrigendum Gazette is 14 June 2023. No draft CEMS clause is carried forward. Selected source text, not all emission law or establishment consent conditions.