Industrial boilers: PM limits by fuel and capacity
Central · Requirement · Version 1
Checked extractOfficial source available
Applicability
Final Schedule I entry 70: listed industrial boilers, bagasse/agro-fuel power-plant boilers, TFH and HAG on equivalent fuel-consumption basis. Coal/lignite power-plant boilers use the separately notified thermal-power-plant standards; establishment consent limits must be checked separately.
Emission sources
Industrial boilers burning coal/lignite, pet coke, bagasse/agro-fuels or FO/LDO/LSHS; bagasse/agro-fuel power-plant boilers; thermic-fluid heaters and hot-air generators on equivalent fuel-consumption basis. Coal/lignite power-plant boilers are excluded from this table.
Compare concentrations on a dry basis after normalising measured PM, SO₂ and NOx to 6% reference O₂ for solid fuels or 3% reference O₂ for liquid fuels. Normalised value = measured value × (21 − reference O₂%)/(21 − measured O₂%). The entry supplies PM limits; it does not itself supply numerical SO₂ or NOx limits.
Principal rule was published 17 May 2023 and commences after two years from publication. G.S.R. 435(E), Gazette 14 June 2023, corrects the omitted serial number from 37 to 97; entry 59 is also omitted.
Schedule I entry 70 final boiler PM standards, read with the captured June 2023 corrigendum. Fuel, equipment and coal/lignite power-plant exclusions are retained.
CPCB assembles the corrigendum on PDF p. 1 before the original Gazette pp. 2–4. Published date refers to the principal rule; corrigendum Gazette is 14 June 2023. No draft CEMS clause is carried forward. Selected source text, not all emission law or establishment consent conditions.