Final Schedule I entry 70: listed industrial boilers, bagasse/agro-fuel power-plant boilers, TFH and HAG on equivalent fuel-consumption basis. Coal/lignite power-plant boilers use the separately notified thermal-power-plant standards; establishment consent limits must be checked separately.
Stack-height formula
H in metres is the greater of 14 × Q_SO₂^0.3 (SO₂ rate in kg/hour) and 74 × Q_PM^0.27 (PM rate in tonne/hour), subject to the minimum heights below. These formulas specify stack height, not permitted emission rates.
Final Schedule I entry 70: listed industrial boilers, bagasse/agro-fuel power-plant boilers, TFH and HAG on equivalent fuel-consumption basis. Coal/lignite power-plant boilers use the separately notified thermal-power-plant standards; establishment consent limits must be checked separately.
Schedule I entry 70 final boiler PM standards, read with the captured June 2023 corrigendum. Fuel, equipment and coal/lignite power-plant exclusions are retained.
CPCB assembles the corrigendum on PDF p. 1 before the original Gazette pp. 2–4. Published date refers to the principal rule; corrigendum Gazette is 14 June 2023. No draft CEMS clause is carried forward. Selected source text, not all emission law or establishment consent conditions.