Industrial boilers: minimum stack-height requirements

Central · Requirement · Version 1

Checked extractOfficial source available

Applicability

Final Schedule I entry 70: listed industrial boilers, bagasse/agro-fuel power-plant boilers, TFH and HAG on equivalent fuel-consumption basis. Coal/lignite power-plant boilers use the separately notified thermal-power-plant standards; establishment consent limits must be checked separately.

Stack-height formula

H in metres is the greater of 14 × Q_SO₂^0.3 (SO₂ rate in kg/hour) and 74 × Q_PM^0.27 (PM rate in tonne/hour), subject to the minimum heights below. These formulas specify stack height, not permitted emission rates.

Source reference: Industrial boiler PM standards: 2023 final rule and corrigendum · p. 4; Entry 70 note (i)

Minimum stack heights

Minimum stack heights
Steam-generation capacityMinimum heightUnit
Less than 2 ton/hour11metre
Higher steam-generation capacity30metre
Source reference: Industrial boiler PM standards: 2023 final rule and corrigendum · p. 4; Entry 70 note (i)

Equipment scope

Final Schedule I entry 70: listed industrial boilers, bagasse/agro-fuel power-plant boilers, TFH and HAG on equivalent fuel-consumption basis. Coal/lignite power-plant boilers use the separately notified thermal-power-plant standards; establishment consent limits must be checked separately.

Source reference: Industrial boiler PM standards: 2023 final rule and corrigendum · p. 4; Entry 70 note (iii)

Source document

Official sources & provenance

Industrial boiler PM standards: 2023 final rule and corrigendum

Ministry of Environment, Forest and Climate Change, Government of India

Published
17 May 2023
Effective from
17 May 2025
Verification
reviewed
Captured
05/10/2026
PDF SHA-256
07c3956385a496c81f817b333f1d8f696d548834c1d2067b837d920e298bed78
View official source ↗View captured PDF ↗

Schedule I entry 70 final boiler PM standards, read with the captured June 2023 corrigendum. Fuel, equipment and coal/lignite power-plant exclusions are retained.

CPCB assembles the corrigendum on PDF p. 1 before the original Gazette pp. 2–4. Published date refers to the principal rule; corrigendum Gazette is 14 June 2023. No draft CEMS clause is carried forward. Selected source text, not all emission law or establishment consent conditions.