CEA earthing above 650 V: connections, annual tests and crossing-guard limit
Central · Requirement · Version 1
Checked extractOfficial source available
Applicability
Regulation 50 concerns apparatus exceeding 650 V. Its common-grid permission is conditional on voltage exceeding 33 kV and system design. The 25-ohm limit applies only to the specified overhead crossing guards, not all factory earthing. Supplier and consumer annual-test duties are separate from the supplier-only Regulation 43 duties.
Earthing-system or mat performance
Earthing-system or mat performance
Provision
Applicable case
Prescribed requirement
50(1)(i)
Entire switchyard/substation equipment and buildings, including associated non-current-carrying metal parts
Effectively earth to a system or mat that limits touch and step potential to relevant-standard tolerable values.
50(1)(ii)
The same earthing system or mat
Limit earth-potential rise to relevant-standard tolerable values, preventing danger from transferred potential through ground, earth wires, cable sheath, fences, pipelines or similar equipment.
50(1)(iii)
The same earthing system or mat
Maintain earth-connection resistance so the protective device operates effectively.
In generating stations, substations and other installations exceeding 33 kV, neutral and protective-frame earthing may be integrated into a common grid if system design warrants, provided combined-mat resistance does not cause step and touch potentials to exceed relevant-standard values.
Annual supplier or consumer earth tests and records
Every supplier-owned or consumer-owned earthing system shall be resistance-tested on a dry day during the dry season not less than once in a year. Maintain records and produce them before the Electrical Inspector if required.
Where the earthing lead and connection are used only in connection with earthing guards under overhead lines exceeding 650 V but not exceeding 33 kV, crossing a telecommunication or railway line, and those lines have an earth-leakage protective device, earth resistance shall not exceed 25 ohms. Project authorities shall obtain no-objection certificates from Railway Authorities and the Power and Telecommunication Coordination Committee before energisation.
Electrical installations, electrical plants and lines, and persons involved in electricity generation, transmission, distribution, trading, supply or use; see Regulation 1(3).
Original 2023 Gazette text, English pages numbered 100–183. CEA lists a 2026 amendment which is captured separately for visual review; original text is not represented as consolidated current regulations.
CEA electrical safety amendment, 2026 — battery storage rules commencing April 2027
Upcoming battery energy storage system provisions in Chapter XA. Regulations 122A–122M cover BESS above 650 V; Regulation 122N addresses BESS at or below 650 V. Commencement is 1 April 2027, not 2026.
Original scanned Gazette manually rendered and read on PDF pp. 1, 4–7. Publication header, English commencement clause and limited BESS scope reviewed. This amendment is upcoming as of 5 October 2026; current 2023 regulations remain separate. No OCR or complete technical compliance certification is claimed.