CEA earthing and tests for systems exceeding 50 V and not exceeding 650 V

Central · Requirement · Version 1

Checked extractOfficial source available

Applicability

Regulation 43 applies to connection with earth of systems exceeding 50 V but not exceeding 650 V, with its printed apparatus provisos. The annual resistance-test and two-year record duties below expressly identify the supplier; they are not imposed here on every consumer.

Voltage range (V)

Exceeding 50 V but not exceeding 650 V

Source reference: CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text · p. 15; Regulation 43 opening; p. 16; Regulation 43 voltage scope

Earth-connection requirements

Earth-connection requirements
ProvisionApplicable casePrescribed requirement
43(i)Three-phase four-wire or two-phase three-wire systemEarth the neutral conductor of the former and middle conductor of the latter as per relevant standards.
43(ii)Neutral conductorAlso earth at one or more points along the distribution system or service line, in addition to any earth connection at the consumer premises.
43(iii)Concentric-cable electric supply linesEarth the external conductor or armour by two separate and distinct connections with the earthing system.
43(iv)Direct-current systemEarthing and safety measures shall follow the relevant standards.
43(v)Every building within the stated Regulation 43 scopeProvide protective equipotential bonding interconnecting exposed and extraneous conductive parts as per relevant standards.
43(vi)Alternating-current systems connected to earth under this regulationElectrically interconnect the systems; each earth connection is bonded to metal sheathing and metallic armouring, if any, of the supply lines.
43(vii)Listed machinery/apparatus of voltage exceeding 250 V but not exceeding 650 VThe owner shall earth by two separate and distinct connections, to the relevant standards, the frame of every generator, stationary and portable motor, metallic parts not intended as conductors, all transformers, other electricity regulating/controlling apparatus and electricity-consuming apparatus.
43(xiii)Neutral point of every generator and transformerConnect to the earthing system by not less than two separate and distinct connections.
Source reference: CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text · p. 16; Regulation 43(i)-(vii) and (xiii)

Metal casing and printed apparatus provisos

Metal casing and printed apparatus provisos
ProvisionApplicable casePrescribed requirement
43(viii)Metal casing or coverings containing/protecting a supply line or apparatusConnect with earth and join across junction boxes and other openings to give good mechanical and electrical connection throughout the length.
43(viii), first provisoSupply not exceeding 250 V; listed fittings and class-II apparatusThe source states that “the conditions mentioned in this regulation shall not apply” where the apparatus consists of wall tubes or brackets, electroliers, switches, ceiling fans or other fittings, other than portable hand lamps and portable and transportable apparatus, unless provided with the earth terminal, and to class-II apparatus and appliances of the relevant standards.
43(viii), second provisoNew or renovated installation with supply not exceeding 250 VAll plug sockets shall be three-pin type; the third pin shall be permanently and effectively earthed.
Source reference: CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text · p. 16; Regulation 43(viii) and its two provisos

Earthing-system performance and pre-energisation tests

Earthing-system performance and pre-energisation tests
ProvisionApplicable casePrescribed requirement
43(ix)(a)Equipotential bonding conductorsCarry prospective earth-fault current without exceeding relevant-standard allowable temperature, keep non-current-carrying metalwork reasonably at earth potential and avoid dangerous contact potentials.
43(ix)(b)Earth-fault loop impedanceKeep sufficiently low for adequate fault current to operate the protective device within the relevant-standard time.
43(ix)(c)All earthing systems, before energising supply lines or apparatusBe mechanically strong, withstand corrosion and retain lifetime electrical continuity; test effective earth bonding as per relevant standards.
43(xii)Each circuit earth-fault loop impedanceLimit to a value determined by the protective-device type and current rating, so supply disconnects on an earth fault before prospective touch voltage becomes harmful.
Source reference: CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text · p. 16; Regulation 43(ix)(a)-(c) and (xii)

Supplier annual resistance test

In addition, all supplier-owned earthing systems shall be tested for resistance on a dry day during the dry season at least once in a year.

Loop-impedance test and supplier record retention

Test earth-fault loop impedance to ensure automatic protective-device operation. The supplier shall keep a record of every earth test and its result for not less than two years after testing and make it available to the Electrical Inspector when required.

Source document

Official sources & provenance

CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text

Central Electricity Authority, Ministry of Power

Published
12 Jun 2023
Effective from
12 Jun 2023
Verification
reviewed
Captured
01/10/2026
PDF SHA-256
2b1ee07ef090f2a0b2c2673e117fdff1e9821c54d5f7812fd77958e1dcf70add
View official source ↗View captured PDF ↗

Electrical installations, electrical plants and lines, and persons involved in electricity generation, transmission, distribution, trading, supply or use; see Regulation 1(3).

Original 2023 Gazette text, English pages numbered 100–183. CEA lists a 2026 amendment which is captured separately for visual review; original text is not represented as consolidated current regulations.

CEA electrical safety amendment, 2026 — battery storage rules commencing April 2027

Central Electricity Authority, Ministry of Power

Published
30 Mar 2026
Effective from
1 Apr 2027
Verification
reviewed
Captured
01/10/2026
PDF SHA-256
8314ccff23f429fd652e7ac92e9a46d7575cdcbc278d2ac6f0abd561778efeb1
View official source ↗View captured PDF ↗

Upcoming battery energy storage system provisions in Chapter XA. Regulations 122A–122M cover BESS above 650 V; Regulation 122N addresses BESS at or below 650 V. Commencement is 1 April 2027, not 2026.

Original scanned Gazette manually rendered and read on PDF pp. 1, 4–7. Publication header, English commencement clause and limited BESS scope reviewed. This amendment is upcoming as of 5 October 2026; current 2023 regulations remain separate. No OCR or complete technical compliance certification is claimed.

Back to library records