Regulation 45 is in Chapter VI, titled safety provisions for installations and apparatus exceeding 650 V. Its notified-voltage branches and explicit mines/oil-fields exception are retained as printed. Apply the relevant Appropriate Government voltage and Regulation 34 generating-capacity notification; no universal notified value is supplied. The future BESS amendment commences 1 April 2027.
Notified inspection thresholds
Notified inspection thresholds
Provision
Applicable case
Prescribed requirement
45(2)
Electrical installations, including supplier or consumer installations
The Appropriate Government shall notify the voltage above which the Electrical Inspector carries out inspection and testing.
34; 45(3)
Generating units, including renewable-energy generating units
Capacity above which the Electrical Inspector inspects before commissioning is determined by the Appropriate Government notification. Regulation 45(3) requires inspection and testing of all apparatus of units above that capacity.
Every electrical installation of notified voltage and below, subject to the printed Chapter VI context and exceptions
Before commencing supply or recommencing after shutdown for six months or more, the owner, supplier or consumer, as applicable, shall inspect, test and self-certify for observance of safety measures and submit the Schedule II self-certification report to the Electrical Inspector.
45(1)(a), second proviso
Owner, supplier or consumer using the self-certification route
They may instead opt to have the installation inspected and tested by the Electrical Inspector of the Appropriate Government.
45(1)(b)
Every installation covered by section 54 of the Electricity Act, including every railway installation
Notwithstanding clause (a), the Electrical Inspector of the Appropriate Government shall inspect and test as specified in sub-regulation (3).
45(3)
Installations above notified voltage and all apparatus of generating units above the Regulation 34 capacity
The Electrical Inspector shall inspect and test before commencing supply or recommencing after shutdown for six months or more, to ensure the specified safety measures are observed.
A self-certified installation is considered fit for commencement or recommencement after shutdown for six months only after the Electrical Inspector office duly receives the report. If not acknowledged within three working days, the report is deemed received.
Supplier pre-application and written-approval conditions
For the above-notified-voltage application described in Regulation 45(4), the supplier shall ensure its supply lines or apparatus are positioned, properly joined, duly completed and examined. Supply needing inspection shall not commence unless Regulations 14–31, 35–37, 46–53 and 57–80 have been complied with and written Electrical Inspector approval obtained. The supplier may energise the lines or apparatus for Regulation 48 tests.
Before applying for approval of an above-notified-voltage installation or additions, the owner shall test every circuit or addition other than an overhead line, satisfy itself that the Regulation 48 testing voltage is withstood, record results and submit them to the Electrical Inspector. The Inspector may direct necessary tests or accept manufacturer-certified tests for particular apparatus instead.
The owner shall not connect apparatus or supply lines comprising additions or alterations until written Electrical Inspector approval or owner self-certification, as applicable, has been obtained.
Mines or oil-fields: installations at 650 V and above
Do not connect to supply until installation work, including alterations, additions or recommencement after shutdown for six months, has written approval from the Electrical Inspector of Mines.
45(7), proviso
Mines or oil-fields: installations below 650 V
Owner, agent or manager of the mine self-certifies before commencement or recommencement after shutdown for six months or more, in the manner specified in sub-regulation (1).
Electrical installations, electrical plants and lines, and persons involved in electricity generation, transmission, distribution, trading, supply or use; see Regulation 1(3).
Original 2023 Gazette text, English pages numbered 100–183. CEA lists a 2026 amendment which is captured separately for visual review; original text is not represented as consolidated current regulations.
CEA electrical safety amendment, 2026 — battery storage rules commencing April 2027
Upcoming battery energy storage system provisions in Chapter XA. Regulations 122A–122M cover BESS above 650 V; Regulation 122N addresses BESS at or below 650 V. Commencement is 1 April 2027, not 2026.
Original scanned Gazette manually rendered and read on PDF pp. 1, 4–7. Publication header, English commencement clause and limited BESS scope reviewed. This amendment is upcoming as of 5 October 2026; current 2023 regulations remain separate. No OCR or complete technical compliance certification is claimed.