CEA installation approval and self-certification: notified-voltage routes

Central · Requirement · Version 1

Checked extractOfficial source available

Applicability

Regulation 45 is in Chapter VI, titled safety provisions for installations and apparatus exceeding 650 V. Its notified-voltage branches and explicit mines/oil-fields exception are retained as printed. Apply the relevant Appropriate Government voltage and Regulation 34 generating-capacity notification; no universal notified value is supplied. The future BESS amendment commences 1 April 2027.

Notified inspection thresholds

Notified inspection thresholds
ProvisionApplicable casePrescribed requirement
45(2)Electrical installations, including supplier or consumer installationsThe Appropriate Government shall notify the voltage above which the Electrical Inspector carries out inspection and testing.
34; 45(3)Generating units, including renewable-energy generating unitsCapacity above which the Electrical Inspector inspects before commissioning is determined by the Appropriate Government notification. Regulation 45(3) requires inspection and testing of all apparatus of units above that capacity.
Source reference: CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text · p. 17; Regulation 45(2)-(3); p. 12; Regulation 34

Approval and inspection routes

Approval and inspection routes
ProvisionApplicable casePrescribed requirement
45(1)(a)Every electrical installation of notified voltage and below, subject to the printed Chapter VI context and exceptionsBefore commencing supply or recommencing after shutdown for six months or more, the owner, supplier or consumer, as applicable, shall inspect, test and self-certify for observance of safety measures and submit the Schedule II self-certification report to the Electrical Inspector.
45(1)(a), second provisoOwner, supplier or consumer using the self-certification routeThey may instead opt to have the installation inspected and tested by the Electrical Inspector of the Appropriate Government.
45(1)(b)Every installation covered by section 54 of the Electricity Act, including every railway installationNotwithstanding clause (a), the Electrical Inspector of the Appropriate Government shall inspect and test as specified in sub-regulation (3).
45(3)Installations above notified voltage and all apparatus of generating units above the Regulation 34 capacityThe Electrical Inspector shall inspect and test before commencing supply or recommencing after shutdown for six months or more, to ensure the specified safety measures are observed.
Source reference: CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text · p. 17; Regulation 45(1)(a)-(b) and (3)

Self-certification receipt condition

A self-certified installation is considered fit for commencement or recommencement after shutdown for six months only after the Electrical Inspector office duly receives the report. If not acknowledged within three working days, the report is deemed received.

Source reference: CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text · p. 17; Regulation 45(1)(a), first proviso

Deemed-receipt period (working days)

3

Source reference: CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text · p. 17; Regulation 45(1)(a), first proviso: three working days

Supplier pre-application and written-approval conditions

For the above-notified-voltage application described in Regulation 45(4), the supplier shall ensure its supply lines or apparatus are positioned, properly joined, duly completed and examined. Supply needing inspection shall not commence unless Regulations 14–31, 35–37, 46–53 and 57–80 have been complied with and written Electrical Inspector approval obtained. The supplier may energise the lines or apparatus for Regulation 48 tests.

Source reference: CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text · p. 17; Regulation 45(4), including test-energisation proviso

Owner circuit tests and Inspector alternatives

Before applying for approval of an above-notified-voltage installation or additions, the owner shall test every circuit or addition other than an overhead line, satisfy itself that the Regulation 48 testing voltage is withstood, record results and submit them to the Electrical Inspector. The Inspector may direct necessary tests or accept manufacturer-certified tests for particular apparatus instead.

Addition or alteration connection condition

The owner shall not connect apparatus or supply lines comprising additions or alterations until written Electrical Inspector approval or owner self-certification, as applicable, has been obtained.

Mines and oil-fields: exact 650 V boundary

Mines and oil-fields: exact 650 V boundary
ProvisionApplicable casePrescribed requirement
45(7)Mines or oil-fields: installations at 650 V and aboveDo not connect to supply until installation work, including alterations, additions or recommencement after shutdown for six months, has written approval from the Electrical Inspector of Mines.
45(7), provisoMines or oil-fields: installations below 650 VOwner, agent or manager of the mine self-certifies before commencement or recommencement after shutdown for six months or more, in the manner specified in sub-regulation (1).

Source document

Official sources & provenance

CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 — original text

Central Electricity Authority, Ministry of Power

Published
12 Jun 2023
Effective from
12 Jun 2023
Verification
reviewed
Captured
01/10/2026
PDF SHA-256
2b1ee07ef090f2a0b2c2673e117fdff1e9821c54d5f7812fd77958e1dcf70add
View official source ↗View captured PDF ↗

Electrical installations, electrical plants and lines, and persons involved in electricity generation, transmission, distribution, trading, supply or use; see Regulation 1(3).

Original 2023 Gazette text, English pages numbered 100–183. CEA lists a 2026 amendment which is captured separately for visual review; original text is not represented as consolidated current regulations.

CEA electrical safety amendment, 2026 — battery storage rules commencing April 2027

Central Electricity Authority, Ministry of Power

Published
30 Mar 2026
Effective from
1 Apr 2027
Verification
reviewed
Captured
01/10/2026
PDF SHA-256
8314ccff23f429fd652e7ac92e9a46d7575cdcbc278d2ac6f0abd561778efeb1
View official source ↗View captured PDF ↗

Upcoming battery energy storage system provisions in Chapter XA. Regulations 122A–122M cover BESS above 650 V; Regulation 122N addresses BESS at or below 650 V. Commencement is 1 April 2027, not 2026.

Original scanned Gazette manually rendered and read on PDF pp. 1, 4–7. Publication header, English commencement clause and limited BESS scope reviewed. This amendment is upcoming as of 5 October 2026; current 2023 regulations remain separate. No OCR or complete technical compliance certification is claimed.

Back to library records