CETPs: online, seasonal and annual monitoring duties
Central · Requirement · Version 1
Checked extractOfficial source available
Applicability
CETP treated outlet under final Schedule I entry 55, effective 1 September 2025. Three discharge routes remain distinct. NS is absence of a specified value in this entry, not zero or unrestricted discharge. Stricter consent/Board standards and ZLD conditions can apply. Member PETP outlets and CETP inlet use separately specified Board/consent limits.
Monitoring frequency
Monitoring frequency
Monitoring subject
Method / parameters
Required timing
Responsible recipient / report
CETP quantity/quality and member pipeline/sewer flows
OCEMS; automated SCADA–PLC, auto-samplers or sensors
Continuous / automated online
CPCB and concerned Board/PCC for OCEMS; State Board/PCC for member-stream data
Tanker movements and received effluent
GPS real-time tracking; sampling and quality check at CETP receipt
Real-time movements and on tanker receipt
CETP operating agency
Soil and groundwater impact from land irrigation discharge
Impact monitoring by CETP management
Twice a year: pre-monsoon and post-monsoon
CETP management
Receiving surface water and groundwater along reaches
All parameters prescribed in stream standards
At least once a year
Analysis report forms part of annual environmental audit
Install OCEMS at CETP with data connectivity to CPCB and concerned Board/PCC. Automate quantity/quality monitoring of member pipeline/sewer effluent individually or in clusters using SCADA–PLC with auto-samplers or sensors; connect that data to State Board/PCC. Install CCTV at appropriate locations to detect bypass/unauthorised discharge.
Establish on-site laboratory facilities for at least pH, BOD, COD, TSS and any additional parameter the State Board/PCC requires. This clause does not itself name a laboratory accreditation body.
Provide the Board/PCC an online list of non-complying member units and action taken. Address and report inadequate conveyance-linkage physical/hydraulic conditions to State agencies. Annual receiving-water/groundwater analyses form part of the annual environmental audit.
State Board/PCC must undertake real-time online monitoring with random physical inspections to check inlet/outlet compliance, stricter/ZLD conditions, OCEMS maintenance/calibration and bypasses. The Board/PCC uploads CETP performance status at least quarterly; this is the regulator’s website duty.
Final substitution of Environment (Protection) Rules Schedule I entry 55 for CETPs. Outlet routes and conditional relaxations are separate from Board-specific CETP inlet and individual PETP consent limits.
English text checked on PDF pp. 7–12. No universal standalone-industry or sewage-treatment-plant limits are inferred. Subsequent facility consent conditions, stricter Board standards and complete current-law consolidation remain separate. Environmental-clearance requirements are outside this extract.