CETP treated outlet under final Schedule I entry 55, effective 1 September 2025. Three discharge routes remain distinct. NS is absence of a specified value in this entry, not zero or unrestricted discharge. Stricter consent/Board standards and ZLD conditions can apply. Member PETP outlets and CETP inlet use separately specified Board/consent limits.
Marine COD relaxation
A proper marine outfall is required and existing shore discharges must convert. The State Board may relax COD only where initial dilution is at least 150 times at discharge and at least 1,500 times 100 m away; maximum COD remains 500 mg/litre. This is conditional Board discretion, not the default sea limit.
Default TDS is 2,100 mg/litre. The concerned State Board/PCC may relax it where member-industry intake water exceeds 1,100 mg/litre, allowing a maximum contribution of 1,000 mg/litre with an absolute treated-outlet cap of 3,100 mg/litre. The table is conditional on that relaxation.
For joint treated-effluent/sewage discharge on land, the State Board prescribes the mixing ratio. Board/PCC permission for sewage within CETP treatment requires improved biological treatability and design that accounts for both hydraulic and organic sewage loads.
Final substitution of Environment (Protection) Rules Schedule I entry 55 for CETPs. Outlet routes and conditional relaxations are separate from Board-specific CETP inlet and individual PETP consent limits.
English text checked on PDF pp. 7–12. No universal standalone-industry or sewage-treatment-plant limits are inferred. Subsequent facility consent conditions, stricter Board standards and complete current-law consolidation remain separate. Environmental-clearance requirements are outside this extract.