GHG emission-intensity targets: Second Schedule for listed obligated entities

Central · Requirement · Version 1

Checked extractOfficial source available

Applicability

Only the named obligated entities and locations listed in the Second Schedule are covered by these target rows. The amendment does not create a general emission-intensity duty for every employer or every facility. Verify the entity registration number, sector, applicable CCTS instrument, later amendments and any current consolidated schedule before relying on a target.

Amendment identity and commencement

The Central Government further amends the Greenhouse Gases Emission Intensity Target Rules, 2025 under sections 3, 6 and 25 of the Environment (Protection) Act, 1986. The instrument is called the Greenhouse Gases Emission Intensity Target (Amendment) Rules, 2025 and comes into force on the date of publication in the Official Gazette (13 January 2026).

Source reference: Greenhouse Gases Emission Intensity Target (Amendment) Rules, 2025 — G.S.R. 25(E) · p. 47; Preamble; rule 1; p. 47; Rule 1(2), commencement

Second Schedule sector coverage

Second Schedule sector coverage
Listed sectorSub-sector or schedule labelNamed entity rowsEnglish PDF pagesTarget unit shown in schedule
AluminiumSecondary Aluminium347tCO2 equivalent / tonne of equivalent product
Petroleum RefineryPetroleum refinery2148–50tCO2 equivalent / MBBLS / NRGF
PetrochemicalPetrochemical units (gas/naphtha crackers or both)1151–52tCO2 equivalent / tonne of equivalent product
TextileSpinning, Processing, Fibre and Composite sub-sectors17352–63tCO2 equivalent / tonne of equivalent product
Source reference: Greenhouse Gases Emission Intensity Target (Amendment) Rules, 2025 — G.S.R. 25(E) · p. 47; THE SECOND SCHEDULE and sector tables; p. 48; Petroleum Refinery table; p. 51; Petrochemical units table; p. 52; Textile table

Compliance-year target calculation

For the Second Schedule, the 2025–26 targets are calculated on a pro-rata basis for the remaining months January 2026 to March 2026. The 2026–27 targets are calculated from the revised 2025–26 target while maintaining the same reduction percentage that the obligated entity would have received if notified for FY 2025–26.

Source document

Official sources & provenance

Greenhouse Gases Emission Intensity Target (Amendment) Rules, 2025 — G.S.R. 25(E)

Ministry of Environment, Forest and Climate Change, Government of India

Published
13 Jan 2026
Effective from
13 Jan 2026
Verification
reviewed
Captured
03/11/2026
PDF SHA-256
877c71816ee1e846b426f6d8c7d1583bcfdaa161335eda5907bc1d2ea815a485
View official source ↗View captured PDF ↗

The amendment inserts the Second Schedule into the Greenhouse Gases Emission Intensity Target Rules, 2025. It lists named obligated entities and their 2025–26 and 2026–27 GHG emission-intensity targets in secondary aluminium, petroleum refinery, petrochemical and textile sectors.

The exact MoEFCC-hosted PDF was captured over verified TLS on 3 November 2026: 1,242,411 bytes, 63 pages, SHA-256 877c71816ee1e846b426f6d8c7d1583bcfdaa161335eda5907bc1d2ea815a485. Applicability is limited to the listed obligated entities and locations. Do not generalise these targets to all employers or treat this historical schedule as a current consolidated schedule without checking later amendments and current CCTS materials. The independently listed eGazette copy is retained as a provenance reference, but this manifest's captured bytes are the MoEFCC copy.

Back to library records