PESO approved CGD pipelines — limited minor-modification amendment route

Central · Requirement · Version 1

Checked extractOfficial source available

Applicability

Specified modifications in already approved Natural Gas City Gas Distribution pipelines under the original PESO circular. The total-length condition and Chief Controller classification discretion apply; the minor-modification inspection branch does not waive prior inspection for major modifications.

Original circular date

11 Sept 2025

Source reference: PESO CGD pipeline approvals — original minor-modification circular, 11 September 2025 · p. 1; Original circular dated heading; no inferred Gazette publication; manually visually reviewed

Qualifying modification and amendment route

Minor modifications in approved Natural Gas CGD pipelines for addition of branches/extensions in pipelines or a CGD connection spurline from a High Pressure Cross Country mainline can be processed under the amendment option of the existing pipeline approval, subject to the stated total-length limit.

Source reference: PESO CGD pipeline approvals — original minor-modification circular, 11 September 2025 · p. 1; Original first operative paragraph; approved-CGD scope and existing-approval amendment route; manually visually reviewed

Maximum total length for this route (km)

3

Source reference: PESO CGD pipeline approvals — original minor-modification circular, 11 September 2025 · p. 1; Original first operative paragraph; total length, not per-branch allowance; manually visually reviewed

Distinct commissioning-inspection branches

Distinct commissioning-inspection branches
Modification branchPrescribed procedural wording
Specified minor modificationSubsequent commissioning permissions for such modifications may be considered without prior inspection by PESO.
Major modificationThe prevailing practice of prior inspection by PESO before commissioning shall be continued.
Source reference: PESO CGD pipeline approvals — original minor-modification circular, 11 September 2025 · p. 1; Original first and second operative paragraphs; discretionary minor branch and retained major inspection; manually visually reviewed

Classification decision and condition

The Chief Controller of Explosives, Nagpur reserves the right to decide whether modifications are minor or major, depending upon the complexity of the proposal.

Source reference: PESO CGD pipeline approvals — original minor-modification circular, 11 September 2025 · p. 1; Original final operative paragraph; decision-maker and proposal-complexity condition; manually visually reviewed

Source document

Official sources & provenance

PESO CGD pipeline approvals — original minor-modification circular, 11 September 2025

Petroleum and Explosives Safety Organisation; Chief Controller of Explosives, Nagpur

Verification
reviewed
Captured
06/10/2026
PDF SHA-256
970c8cf6dbfa1af2ae431ee4e8e0c6f61701b366d8b8c56bcad7707317ab74e0
View official source ↗View captured PDF ↗

Original PESO procedural circular for specified minor modifications in approved Natural Gas City Gas Distribution pipelines, and distinct major-modification inspection/discretion branches. This is not a Schedule 2/3 chemical-threshold amendment.

The original signed one-page circular has an order date but no separate Gazette publication or commencement clause. The captured original is an administrative procedure source, not a consolidated MSIHC Rules instrument. Later superseding procedural circulars are not exhaustively reconciled here.

Back to library records