PESO pipeline commissioning — original FAQ document inventory
Central · Requirement · Version 1
Checked extractOfficial source available
Applicability
Original FAQ commissioning-document inventory. The 2025 circular permits considering commissioning without prior PESO inspection only for its specified minor modifications in approved Natural Gas CGD pipelines within a total 3 km; this is discretionary, with minor/major classification reserved to the Chief Controller of Explosives, Nagpur according to proposal complexity. Major modifications retain prior inspection.
Commissioning document inventory
Commissioning document inventory
List position
Printed item
Document or drawing
1
a
As built schematic drawing showing pipeline length and location/chainage of Dispatch Terminal, Receipt Terminal, Intermediate stations, major crossings and sectionalizing valve locations.
2
b
As built route map on political or topographic map showing location/chainage of turning points, Dispatch Terminal, Receipt Terminal, Intermediate stations, major crossings and sectionalizing valve locations.
3
c
As built layout of Dispatch station showing hook up location.
4
d
As built layout of receipt station showing hook up location.
5
e
As built piping and instrumentation diagram.
6
f
As built Intermediate stations layout showing pipeline.
7
g
As built profile map.
8
h
EIA report and compliance of EIA recommendations.
9
i
QRA report and compliance of EIA recommendations.
10
i
HAZOP study report and compliance of EIA recommendations.
11
k
Copy of RoW/RoU notification.
12
l
Copy of permission from concerned authorities on whose land the pipeline is laid.
13
m
Copy of crossing permissions.
14
n
Detailed feasibility report and pipeline thickness calculation.
15
o
Methodology for corrosion protection.
16
P
Signed online application form.
17
q
Duly filled and signed Schedule-7.
18
r
Duly filled and signed Schedule-8.
19
s
Independent Safety Audit report and compliance of recommendations.
PESO pipeline prior-approval and commissioning document lists and expressly stated submission/land-permission branches on pages 17–19.
The original FAQ is administrative guidance with no printed publication or commencement date. Both lists repeat item (i) and print EIA recommendations beside QRA and HAZOP reports; those words are retained without repair. This extract does not establish a universal MSIHC audit threshold, a 49-bar design pressure or complete current consolidation.
PESO CGD pipeline approvals — original minor-modification circular, 11 September 2025
Petroleum and Explosives Safety Organisation; Chief Controller of Explosives, Nagpur
Original PESO procedural circular for specified minor modifications in approved Natural Gas City Gas Distribution pipelines, and distinct major-modification inspection/discretion branches. This is not a Schedule 2/3 chemical-threshold amendment.
The original signed one-page circular has an order date but no separate Gazette publication or commencement clause. The captured original is an administrative procedure source, not a consolidated MSIHC Rules instrument. Later superseding procedural circulars are not exhaustively reconciled here.