Construction waste — 2025 producer registration and management plans
Central · Requirement · Version 2
Checked extractOfficial source available
Applicability & limits
C&D Waste Rules 2025 excerpts, effective April 2026. Waste duties are distinct from labour site safety. Project facts, local approval, complete EPR/utilisation target schedules and actual portal registration remain pending.
Applicability
Rules cover construction, demolition, remodelling, renovation and repair, subject to Rule 2 exclusions. Producer means waste-generating occupier/in-charge of a building/project of at least 20,000 square metres built-up area.
Producers, intermediate waste-storage operators, recyclers and local/development-authority collection points register on the online portal; separate categories if multiple, and no business without registration.
Central Pollution Control Board issues registration certificate within 15 days of receiving the application. This does not supply an actual application or certificate.
Producer prepares a project waste-management plan assessing all waste streams and submits it to the local authority for approval. This is a waste-management plan requirement, distinct from the construction safety plan.
Producers deposit all waste with the processing facility or, where absent, intermediate storage; in-situ processing leftover goes to processing. Registered entities enter waste generation/handling/storage/recycling data for annual material-balance verification.
Construction, demolition, remodelling, renovation and repair of structures; Rule 2 contains exclusions for atomic-energy waste, defence/strategic projects, disaster/war waste and other sector-specific waste rules.
Identity, Rule 1 commencement and Rule 2 scope checked on PDF p. 19. EPR quantities, registration conditions, schedules and filing details remain under field-level review.